Leipzig Zoo

Pongoland - Gorillas

Frank Oberwemmer, Peter Rasbach (authors), Monika Fiby (editor, translator)
Published 2001-7-24
deutsch

 

UP LOCATION:

Pfaffendorfer Straße 29 , D-04105 Leipzig , Germany
Phone: 0049-341-5933500
Fax: 5933303
URL: http://www.zoo-leipzig.de


UP KEY WORDS:

Wolfgang Köhler Primate Research Center, behavior and cognition research


UP ANIMALS:

Family:Species:Common Name:Capacity:
PongidaeGorilla gorillagorilla10


UP DESCRIPTION:

In 1997 the Max-Planck-Institute for Evolutionary Anthropology offered to establish a branch for comparative behavioral observation of primates in Leipzig, thus paving the way for the construction of a new great apes' habitat at the zoo. The project's concept is a worldwide one-of-a-kind attempt to combine intensive scientific research with contemporary animal keeping and display. As part of the recreation of a research camp on the Ivory Coast and a jungle village, the habitat is the heart of "Pongoland", the first phase of the "Leipzig Zoo's 21" master plan targeted to be carried out over the next 15 years.

On about 30,000 m2 enclosures suited to the animals needs show part of the animals' habitats with about 60 animals. A large tropical house was constructed which is surrounded by five outdoor enclosures, one of which is used by gorillas. In order to meet the demands of the scientists observation areas were set up, where they have a view of each individual preserve in its entirety without being disturbed by zoo guests. In order to offer optimal surroundings for apes and scientists a jungle was created replicating the apes' habitat in detail.

The barriers and walls of the building are made to look like embankments and rock walls. The roof has a thick covering of shrubs, bamboo, and large trees so that the architecture remains for the most part hidden. The space is divided by the east-west visitors' route. There are thus two enclosures on the north side and three on the south for the different groups of apes. The two storey tract in the north houses offices, project rooms, kitchen and toilet facilities of the Max Planck Institute on the gound floor as well as the two-storey technology center. The upper floor contains the zoo rooms such as feed kitchen, veterinary surgeon and X-ray room, staff room, workshop, storage rooms and toilet facilities. In the areas bordering the hall to the east and west are the rooms for looking after the animals. The ground floor primarily houses the animal retreat quarters and observation rooms. The upper storey contains sleeping quarters and oberserving rooms. The tropical house is covered by a transparent sheet roof, allowing optimal light and the necessary introduction of ultraviolet rays.

Total heat demand for the rooms was to be covered by static heating surfaces. Heating surfaces in the hall were installed in planted areas eight meters high above the floor, to ensure that these systems are not directly visible to the visitors. Control of the four heating circuits is carried out via the room temperature. A ventilation system is installed to circulate room air and to distribute heat. This ventilation system generates threefold air exchange. The system circulates 45,000 m3 of air per hour.
 

UP SIZE:

Exterior space is 24,705 m2 including exhibit area (about 12,210 m2), water moats (about 4,645 m2, 1.3 m deep and up to 10 m wide), visitor paths and green space (about 7,850 m2). The outdoor exhibit for gorillas is 2,465 m2.

The building is about 3,255 m2 including exhibits and dry moats (together 1,307 m2), planters indoors (581 m2) and a green roof (1,250 m2). Usable floor space of the building is 2,900 m2, volume about 34,000 m3. The tropic hall is 1,600 m2 and 12 to 19 m high. Indoor enclosures are 246 m2 for gorillas.

Space allocation in square meters:

useindoorsoutdoors     total exhibit    
accessible     total     accessible     total    
animals2462,465
visitors
others
total

 

UP COSTS:

DM 31,000,000 including -1 % for design.

2.8 mio. DM were funded by the city of Leipzig.
 

UP OPENING DATE:

March 2001
 

UP DESIGN:

Beginning:

  • Architecture, exterior space and exhibits: Rasbach Architects, Oberhausen, Germany
  • Safari ride: explore ErlebnisProduktionen, Vienna, Austria
  • Safari ride: Kraftwerk Living Technologies, Wels, Austria
  • Architecture of primate center: Dipl.-Ing. Herbert Kochta, Munich, Germany

UP CONSTRUCTION:

Beginning: May 1999

  • Supervision of building: Ing. Dieter Ziner und Sohn, Krailling, Germany
  • Supervision of exterior space: Ing. Büro Klaus Roeder, Leipzig, Germany
  • Illusion painting: Axel Krause, Leipzig, Germany
  • Landscaping: Krahnstöver & Wolf GmbH, Grosspösna, Germany

UP LOCAL CONDITIONS:

walter.gif This is a climatic diagram for the closest weather station.

 

UP PLANTS:

The primate park is located in the Rosental nature reserve and carries some valuable stock of trees which has been taken into consideration when planning. Up to 12 m tree trunks were added to the existing trees together with numerous shrubs, grasses and bamboo and rockwork, thus creating a habitat for apes.

The plants used outdoors are specified in the following list. The plants used indoors are listed in the presentations of orangutans and bonobos at Pongoland.

The plant list specifies the Latin names of the plants used for this exhibit.


UP FEATURES DEDICATED TO ANIMALS:

Outdoor enclosures are separated from each other and the audience by shallow swampland rifts. Nets underneath the surface of the water are there to prevent any animals from drowning. The building serves only to provide the animals with the climatic conditions they need to live in all year round. Under the skin of the transparent roof, tropical temperatures and humidity can be maintained even in the winter months. Owning of primates under ideal conditions requires a minimum temperature in the hall of 22 °C during the winter months. In summer, the interior temperature must not climb above 32 °C. To imitate the primates' natural habitat to the greatest possible extent, humidity in the rooms should lie between 60% and 80% relative humidity of air. Patches of fog pervade the room and intensify the humid climate. The sleeping rooms were fitted with floor heating. Surface temperature in the cages is kept at a constant level of 25 °C. This is necessary for the apes' comfort. Temperature measurements are taken via probes built into the floor. When required the lighting system can lengthen the all too short days.

The habitats have natural flooring made of grass and sand. Jungle gyms made of tree trunks lashed together with bushropes, rocks and water ponds round off the items provided for the inhabitants.
 

UP FEATURES DEDICATED TO KEEPERS:


 

UP FEATURES DEDICATED TO VISITORS:

Visitors can experience a simulated safari in Africa and see a mock-up of a researcher's camp. Then they travel from one habitat to another via strongly meandering forest paths and wooded foot bridges. However, from non of the vantage points will the individual guest have a complete view of the entire area once the lush, green vegetation has reached its final quality in a few years. Visitors become a part of the apes' environment and are separated from them only by wet and dry moats and, in some locations, shatterproof glass. Some of the observation huts jut out into the moats and enable one to have close contact with the animals.

The visitor enters the house through draught-excluding flap doors to where the ape enclosures open up piece for piece behind visitors' caves, dry ditches and plant areas on both sides of the path. On both sides of the visitors' caves are four research rooms that can be seen. Here the various stages of the research can be demonstrated to the public. After leaving the park, visitors end their adventure in a jungle village with a zoo shop, restaurants and snack bars, restroom facilities, and a petting zoo with African pets. Visitors may thus observe the apes in both their outdoor and indoor areas, and even observe some scientific studies as they take place.
 

UP INTERPRETATION:

A system of markers, some of which are interactive, provides the visitor with all the important information about the animal species and their habitats.
 

UP MANAGEMENT:

A separate quarantine building has been built to allow optimum preparation of new animals for integration into the existing inventory
 

UP RESEARCH:

Research at the new Wolfgang Köhler Primate Research Center focuses on the behavior and cognition of the primates chimpanzees, gorillas, orangutans and bonobos. Researchers and students from the University of Leipzig, and other universities around the world conduct their research projects at the center guided by on-site personnel. Detailed descriptions may be found in the book "Primate Cognition" by Michael Tomasello and Josep Call, Oxford University Press, 1997.
 

UP CONSERVATION:

Zoo Leipzig participates in EEP's for all apes.

The ventilation unit is equipped with a rotary heat exchanger that extracts heat and humidity from exhaust air and adds it to fresh air streaming into the building. In this way, use of energy for heating and humidifying purposes is reduced. Distribution of the air to perimeter outlets, positioned in planed areas, as well as redistribution to the technical room is carried out via underground pipes. Humidifying of the air in the hall is carried out via a nozzle system that works with partially softened water and compressed air. In summer the fine pulverization of water leads to its evaporation and causes cooling of the air. This adiabatic cooling method is a cost effective alternative to conventional cooling via refrigerating plants. During the summer months, and on sunny days during in-between seasons, ambient air is allowed to stream into the building via lower openings in the external walls and is carried off via lamellas in the roof construction. Through the continuous air stream, cooling of the room down to shadow air-temperatures outside of the building can be achieved. The air stream is controlled via the room temperature. The principle of buoyancy, which is caused due to the height differences in the building, is used.
 

UP LOCAL RESOURCES:


over_t.jpg
30K33K
Overview
©Zoo Leipzig, 2001

 
site_t.jpg
53K82K
Site Plan
©Zoo Leipzig, 2001

 
0_t.jpg
48K83K
Gorilla (1)
©Zoo Leipzig, 2001

 
1_t.jpg
48K + description48K
Siteplan of building (2)
©Zoo Leipzig, 2001

 
2_t.jpg
32K56K
Section (3)
©Zoo Leipzig, 2001

 
3_t.jpg
46K52K
Entrance (4)
©Fiby, 2001

 
4_t.jpg
45K + description75K
Research Camp (5)
©Fiby, 2001

 
5_t.jpg
37K + description54K
Ticket booth to safari (6)
©Fiby, 2001

 
6_t.jpg
40K + description65K
Safari bus (7)
©Rasbach Architekten, 2001

 
7_t.jpg
27K + description42K
On safari (8)
©Fiby, 2001

 
8_t.jpg
32K46K
Monitor (9)
©Fiby, 2001

 
9_t.jpg
52K + description81K
Silverback (10)
©Fiby, 2001

 
10_t.jpg
57K + description87K
Tropical hall (11)
©Fiby, 2001

 
11_t.jpg
45K76K
Indoor exhibit (12)
©Fiby, 2001

 
12_t.jpg
34K56K
Fresh browse (13)
©Fiby, 2001

 
13_t.jpg
37K58K
Interpretation (14)
©Fiby, 2001

 
14_t.jpg
35K59K
Gorillas (15)
©Gabler, 2001

 
19_t.jpg
43K73K
Gorilla outdoors (15)
©Rasbach Architekten, 2001

 
15_t.jpg
26K43K
Cross section (16)
©Rasbach Architekten, 2001

 
16_t.jpg
57K92K
Siteplan of complete Pongoland (17)
©Rasbach Architekten, 2001

 
17_t.jpg
46K83K
Arial picture (18)
©Rasbach Architekten, 2001

 
18_t.jpg
54K93K
Arial picture (19)
©Rasbach Architekten, 2001

 

null.gifLOCATIONKEY WORDSANIMALSAWARDSnull.gifDESCRIPTIONSIZECOSTSOPENING DATEnull.gifDESIGNCONSTRUCTIONLOCAL CONDITIONSPLANTSnull.gifFEATURES ANIMALSFEATURES KEEPERSFEATURES VISITORSINTERPRETATIONnull.gifRESEARCHMANAGEMENTCONSERVATIONLOCAL RESOURCESnull.gif

You are visitor number 13068 to this exhibit presentation.


TOP
Revised 2010-07-25
About | Gallery | Service | Firms | Fun | Research
pfeil_pix.gif